DIY Solar UK: A Homeowner's Guide to Plug-In Solar Installation
Updated August 2026. Plug-in solar is designed to make small-scale solar practical for homeowners, renters, and flat dwellers. This guide explains what a homeowner can do themselves, what needs a qualified or competent person, and how the BS 7671Amendment 4 wiring rules fit with the 800 W plug-in solar route.
800W
Plug-in solar limit
13A
Socket connection
IP65
Outdoor inverter minimum
28 days
G98 notification
What homeowners can safely do themselves
The DIY part of plug-in solar is deliberately limited. A homeowner can unpack the kit, mount panels using the manufacturer's brackets, connect the supplied leads, position the inverter, and plug the finished kit into a suitable 13 A socket. That is the boundary that makes the route different from conventional rooftop solar.
Mounting still needs care. Panels must be fixed so they cannot slide, fall, or catch the wind. Balcony brackets, garden frames, wall brackets, and flat roof mounts should be used only as the instructions allow. If the kit supplier specifies ballast, fixings, tilt limits, or no-drill mounting rules, follow those instructions exactly.
DIY means use the kit as supplied
What needs a qualified or competent person?
Call an electrician or another competent electrical professional for any work beyond plugging in the kit. That includes hardwired connections, new circuits, consumer unit changes, work on breakers, work on RCD or RCBO protection, three-phase arrangements, fixed isolators, and battery storage wiring. Those jobs involve the fixed electrical installation and must be designed, installed, inspected, and tested properly.
Battery storage is especially important. A plug-in solar panel kit is not the same as a hardwired home battery. If a battery is wired into the home or can export through an inverter, the design may need G98 or G99 assessment as well as the wiring requirements in BS 7671.
Outdoor equipment and IP ratings
Outdoor solar equipment must be suitable for outdoor use. As a practical baseline, an inverter installed outdoors should be rated at least IP65, which means it is protected against dust and water jets. Do not place indoor-only power supplies, sockets, extension leads, or connectors outside.
Use weatherproof connectors supplied with the kit and keep them fully engaged. Avoid locations where water pools, where cables are pulled tight, or where the inverter sits in direct spray from gutters. If the manufacturer requires a shaded or ventilated position, follow that instruction.
Cable routing: simple safety rules
Cable routing is one of the main DIY risks. Keep cables out of walkways, doors, windows, garden paths, balcony thresholds, and places where people can trip. Do not crush cables under furniture, clip them where they can rub on sharp metal, or run them through puddles. Outdoor cable runs should be weatherproof, supported, and arranged so water cannot track into a plug or socket.
Avoid temporary extension leads as a permanent route. If the kit cannot reach a suitable socket without a poor cable run, call an electrician and ask whether a suitable socket or hardwired arrangement is needed.
Plug-in vs hardwired solar
| Feature | Plug-in solar | Hardwired solar |
|---|---|---|
| Connection | Supplied 13 A plug into a suitable socket | Fixed wiring or consumer unit connection |
| DIY boundary | Homeowner can mount and plug in as instructed | Needs competent electrical installation work |
| Network route | G98 notification for compliant 800 W kits | G98 or G99, depending on capacity and design |
| Best fit | Small, removable, manufacturer-approved kit | Larger rooftop system, battery system, or new circuit |
Safety checklist before plugging in
- Use an approved plug-in solar kit within the 800 VA limit.
- Check the socket is in good condition and protected by an RCD or RCBO.
- Use only the supplied plug, leads, connectors, inverter, labels, and instructions.
- Keep outdoor equipment weatherproof, with at least IP65 for an inverter installed outdoors.
- Route cables so they do not create trip hazards or sit in standing water.
- Do not connect through damaged sockets, adaptors, multiway blocks, or improvised extension leads.
- Stop and call an electrician for consumer unit work, fixed wiring, three-phase supplies, or battery wiring.
After installation, submit a G98 notification to your DNO (your electricity network operator). The G98 notification guide explains the 28-day rule, and the G98 form generator helps create the paperwork.