Is Plug-In Solar Legal in Great Britain?

Last reviewed: 27 August 2026. This page is updated whenever the regulatory position changes — see the regulatory updates feed below.

Yes — plug-in solar is legal in Great Britain from 27 August 2026

Plug-in solar is legal in Great Britain as of 27 August 2026 for devices that meet the legal route. The UK government passed SI 2026/848, which creates a legal route for plug-in solar microgenerators that meet the IPS. It came into force on 27 August 2026. The wiring rules (BS 7671 Amendment 4) are in force too, and both now apply: the SI permits compliant devices, and the wiring standard defines how they must be installed.

Yes

Legal in Great Britain from 27 August 2026

GB

Great Britain route, not Northern Ireland

SI 2026/848

Instrument that changes the legal status

The short version

  • Plug-in solar is legal in Great Britain from 27 August 2026 — for devices that meet the IPS and are on the ENA Connect Direct register.
  • Check the exact model on the register before you buy; non-compliant kits are still illegal to plug in.
  • Notify your electricity network within 28 days of plugging in — our free G98 form tool does the paperwork in minutes.

Quick answer

Yes — plug-in solar is legal in Great Britain from 27 August 2026, when statutory instrument SI 2026/848 came into force (England, Scotland, Wales). But only for devices that meet the Interim Product Specification (IPS) and are registered on the ENA Connect Direct platform. Buying a non-compliant kit and plugging it in remains not legal — check the register for the exact model before you buy.

The wiring rules that govern how a plug-in solar system must be installed (BS 7671 Amendment 4) have been in force since 15 April 2026. These rules define the technical standards — 800 VA maximum apparent power, 16A per phase, G98 notification within 28 days, residual current protection (RCD/RCBO per the IPS), labelling — and since 27 August 2026, SI 2026/848 has sat on top of them, legalising the sale and use of compliant plug-in solar devices.

Regulatory timeline

The legalisation of plug-in solar in the UK has been a multi-step process involving the wiring regulations (BS 7671), a government consultation, an Interim Product Specification, and a statutory instrument. Here is the timeline so far and what to expect next:

DateEventStatus
15 Apr 2026BS 7671 Amendment 4 published — wiring rules for plug-in solarDone
15 Apr 2026BS 7671 Amendment 4 comes into forceDone
24 Mar 2026Government announces plug-in solar intention; manufacturers including EcoFlow working with governmentDone
Jul 2026Government response to consultation published; IPS requirements confirmedDone
16 Jul 2026SI 2026/848 made — statutory instrument legalising plug-in solarDone
11 Aug 2026Ofgem approves G98 amendment (DCRP/MP/26/02) — confirms one kit per household, allows coexistence with existing solar, introduces consumer self-notificationDone
27 Aug 2026SI 2026/848 comes into force — plug-in solar is legal for compliant devicesIn force
After 27 AugManufacturers register IPS-compliant products on ENA Connect DirectExpected
TBAFull product certification scheme replaces IPS (longer-term)Future

What is not legal?

The route is live but narrow

Plug-in solar is legal in Great Britain from 27 August 2026 — but only for devices that meet the SI 2026/848 route. Connecting anything else can breach the Plugs and Sockets etc. (Safety) Regulations, could invalidate your home insurance, and could create safety liability.

Specifically, even now that the route is in force:

  • Selling plug-in solar devices that are not compliant with the IPS is not permitted.
  • Connecting a device that does not meet the IPS is not legal under this route.
  • Using a plug-in solar device that has not been registered on ENA Connect Direct by its manufacturer is not permitted — only registered devices are legal under this route.
  • Plug-in batteries are outside this route entirely. Battery-integrated products are not covered, whatever the marketing says.

Before you connect anything: check the device against the G98 requirements, plan the installation, and verify the product is registered on Connect Direct.

SI 2026/848 explained

The Plugs and Sockets etc. (Safety) Regulations 1994 and Electricity Safety, Quality and Continuity Regulations 2002 (Amendment) Regulations 2026, known as SI 2026/848, is the statutory instrument that creates a legal route for compliant plug-in solar devices in Great Britain. It was made (signed into law) on 16 July 2026 and came into force on 27 August 2026.

The SI amends the existing Plugs and Sockets etc. (Safety) Regulations 1994 and the Electricity Safety, Quality and Continuity Regulations 2002 to create a new category for plug-in solar devices that meet the Interim Product Specification (IPS). It creates a narrow route: devices must have an approvable BS 1363 plug fitted by the manufacturer, meet the IPS, and satisfy ESQCR/ENA requirements. The final IPS v2 document was published by government on 16 July 2026, alongside the consultation response. Key requirements under the SI and IPS:

  • Devices must not exceed 800 VA apparent power (maximum 800 VA and 3.5 A, per the IPS).
  • The panels can be larger than the inverter limit: the IPS allows up to 2,000 W of connected DC panel capacity.
  • The manufacturer-fitted plug must be a BS 1363 plug with a BS 1362 fuse not exceeding 5 A.
  • Devices must meet the IPS technical specification (published by government).
  • Devices must be registered by the manufacturer on ENA Connect Direct.
  • Devices must use a compliant microinverter that meets G98/ENA type test requirements.
  • Installation must comply with BS 7671 Amendment 4 wiring rules.

The SI uses an interim specification (IPS) rather than a full product certification scheme to get plug-in solar to market quickly. The government has indicated that a fuller certification scheme will follow, but the IPS ensures that products on the market from 27 August 2026 meet minimum safety standards.

Interim Product Specification (IPS)

The Interim Product Specification (IPS) is the technical specification that plug-in solar devices must meet to be legally sold and used in Great Britain from 27 August 2026. The government published the IPS following the plug-in solar consultation. An earlier version was withdrawn and replaced by a final version.

The IPS covers:

  • Maximum inverter output: 800 VAapparent power and 3.5 A current.
  • Maximum panel input: up to 2,000 W of PV module DC power. The 800 W-style limit is the AC inverter output, not the total panel wattage.
  • Microinverter safety and grid-connection requirements.
  • Plug and socket standards: a non-rewireable BS 1363 plug with half-insulated pins and a BS 1362 fuse not exceeding 5 A.
  • One plug-in solar product per final ring circuit under IPS v2. Ofgem confirmed on 11 August 2026 that G98 takes precedence — one device per household applies. A plug-in kit can run alongside existing solar within the 16 A per phase limit.
  • Labelling and user information requirements.
  • Residual current protection (RCD/RCBO) requirements per IPS specification.
  • Automatic disconnection on grid loss (anti-islanding).

The final IPS v2 is based on the German DIN VDE V 0126-95 plug-in solar standard, adapted for UK sockets and ring-final circuits. The government said the consultation received 466 responses and that over 85% of respondents supported the IPS. Manufacturers must test their products against the IPS and register compliant devices on the ENA Connect Direct platform (which replaced the old ENA Type Test Register in April 2024). Only products registered onConnect Direct should be treated as eligible for the new route.

G98 notification requirements

Now that plug-in solar is legal from 27 August 2026, anyone who installs a kit must notify their Distribution Network Operator (DNO) within 28 days using a G98 notification form. This is a notification, not an application for approval — an in-scope, correctly completed G98 notification for a sub-16A system does not need prior DNO approval, but the DNOcan still assess it, query it, or reject it if the installation is out of scope or the details are wrong. On 11 August 2026, Ofgem approved the G98 amendment (DCRP/MP/26/02) that confirms one plug-in kit per household, allows a plug-in kit to run alongside existing solar within the 16 A per phase limit, and introduces a consumer self-notification process. Since 31 August 2026, ENA's consumer portal at myplugin.solar handles this notification online — you verify with an email code, confirm the address, select your device, and submit. It notifies your network operator; it does not approve anything.

G98 is a notification, not an application

You do not need to wait for DNO approval. You notify within 28 days of connecting the system. The DNO acknowledges receipt. That is the full process. Use our free G98 form generator to create the completed form in 5 minutes.

Note: the legal route for plug-in solar comes from SI 2026/848 and the IPS, not from BS 7671 Amendment 4 itself. BS 7671 sets wiring standards; the SI and IPS create the product-level legal category.

The G98 form requires your name, address, MPAN (Meter Point Administration Number — found on your electricity bill), system details (inverter model, capacity, panel count), and installation date. Our G98 form generator walks you through this step by step and produces a completed PDF ready to send by the checked route for your confirmed network operator.

For more detail, see our G98 Notification Guide or the G98 form walkthrough.

Approved products list

The ENA Connect Direct register grows as manufacturers complete testing. Our register read of 14 September 2026 (tracking the 13 September register state, unchanged from the 10 September check) found 49 devices assessed under the IPS route, of which 48 are marked Compliant across thirteen manufacturers. UKSOL was the first manufacturer to reach compliance on 20 August 2026, and Perlight the second on 28 August. The on-sale picture changes faster than the register: check our kit readiness guide for who is actually selling compliant kits this week. Entries from manufacturers that failed their first filings have been resubmitted or removed — always check the register directly for the exact model.

The following manufacturers have been mentioned in government or industry announcements, or have products on the register. This is not a guarantee of registration — only products listed on ENA Connect Direct are eligible. Check the register directly.

ManufacturerProductCapacityGB Status
UKSOLPlug-In Solar Pro (460W / 890W)460W single-panel, 890W dual-panel ground mountFirst to reach compliance on ENA Connect Direct (20 August 2026). Seven products registered. Ground mount kits on sale, plus a 515W hybrid bundle reported at Argos.
PerlightPowerPlug MAX 465465W panel, 0.8 kW registered capacitySecond manufacturer to reach compliance (28 August 2026). Its twelve PowerPlug models are listed Compliant; the MAX quartet is sold through Plug In Solar — check the kit readiness guide for current stockists.
EcoFlowPowerStream (plug-in solar kit)Expected up to 800 VA routeManufacturer named in GOV.UK rollout wording; register entry ECOFL/21128/V1 (26 August 2026) is marked Non-compliant
Anker SOLIXSolarbank / Balcony Solar*Battery products require separate cautionBattery-integrated plug-in solar is outside the first IPS route
BluettiPending UK plug-in solar productTBANo UK plug-in solar kit confirmed yet
RenogyPending UK plug-in solar productTBAPrimarily US-focused; no UK kit confirmed

* Battery-integrated systems (e.g., Anker SOLIX with 2kWh battery) are currently excluded from the IPS specification. Only solar-only plug-in microgenerators are eligible for IPS registration. Battery products may be covered by separate regulations. GOV.UK has said it will keep gathering evidence on extending the route — so a battery-inclusive second route is plausible but has no announced date; our regulatory monitor tracks this and this page will change the day anything is announced.

We monitor this daily

Our regulatory monitoring system checks for new ENA Connect Directregistrations and manufacturer announcements every Monday, Wednesday, and Friday. This page is updated as soon as a new product is registered. Check back regularly or watch the updates feed below. See our best plug-in solar kits comparison for details on each manufacturer.

Regulatory updates feed

This feed tracks every change to the UK plug-in solar regulatory position, newest first. Each entry is dated and sourced. We monitor BS 7671 amendments, SI updates, ENA registrations, MCS listings, Ofgem policy changes, and manufacturer announcements.

28 August 2026

Perlight becomes second compliant manufacturer on ENA register

The Perlight PowerPlug MAX 465 (PERLI/21158/V1) was listed Compliant on the ENA Connect Direct register — the first compliant device from a manufacturer other than UKSOL. At that date the register stood at 20 devices assessed, 8 Compliant. Perlight had no UK stockist then; the register and the stock picture have both moved since — see our register read of 14 September 2026 in the approved products list below.

Source: Plug-In Solar Register — daily ENA register tracker

11 August 2026

Ofgem approves G98 amendment — plug-in solar grid route confirmed

Ofgem approved DCRP/MP/26/02, the G98 Issue 2 Amendment 1 modification that gives plug-in solar a formal grid-connection route. It confirms one plug-in kit per household (G98 takes precedence over the IPS one-per-circuit wording), allows a plug-in kit alongside existing solar within the 16 A per phase limit, and introduces a consumer self-notification process. The ENA launched the consumer notification portal at myplugin.solar on 31 August 2026, so homeowners can now notify their network operator online; Connect Direct remains the industry-facing route.

Source: Ofgem — DCRP/MP/26/02 decision

27 August 2026

SI 2026/848 in force — plug-in solar legal from today

The statutory instrument came into force on 27 August 2026. Compliant plug-in solar microgenerators can now legally be sold, installed, and connected in Great Britain, with G98 notification to the network operator within 28 days of connection.

Source: legislation.gov.uk — SI 2026/848

July 2026

Government response to plug-in solar consultation published

The government published its response to the plug-in solar consultation, confirming the regulatory route, the IPS requirements, and the ENA Connect Direct registration process for manufacturers.

Source: GOV.UK — Plug-in solar government response (July 2026)

24 March 2026

Government says manufacturers are working on plug-in solar rollout

The government announced its intention to make plug-in solar devices available "within months" and said manufacturers such as EcoFlow were working with government on the rollout.

Source: GOV.UK — Government news, 24 March 2026

15 April 2026

BS 7671 Amendment 4 published and comes into force

The IET and BSI published Amendment 4 to BS 7671:2018 on 15 April 2026, covering stationary batteries, medical locations, Power over Ethernet, and other topics. It does not itself create the plug-in solar route — that comes from SI 2026/848 and the IPS. It is in force from this date.

Source: BS 7671:2018+A4:2026 — IET/BSI Wiring Regulations

Frequently asked questions

Can I buy a plug-in solar kit and install it now?

Plug-in solar is legal in Great Britain from 27 August 2026, but only for devices that meet the route. Buy a device that is registered on ENA Connect Direct as IPS-compliant. UKSOL became the first manufacturer to reach compliance on 20 August 2026, and Perlight the second on 28 August. Our register read of 14 September 2026 (tracking the 13 September register state) found 48 compliant devices across thirteen manufacturers, with compliant kits on sale from several makers — see the kit readiness guide for the current stock picture.

What happens if I install a non-compliant kit?

Connecting a device that does not meet the SI 2026/848 route can breach the Plugs and Sockets etc. (Safety) Regulations. This could invalidate your home insurance, create liability for any electrical safety incident, and potentially result in enforcement action. Check the register before you buy.

Is BS 7671 Amendment 4 the same thing as legalisation?

No. BS 7671 Amendment 4 sets the wiring rules (how to install safely), but it does not legalise the sale or use of plug-in solar devices. Legalisation required SI 2026/848, which came into force on 27 August 2026. The two work together: the SI makes it legal, the wiring standard defines how it must be done.

Will I need an electrician to install plug-in solar?

No — one of the key features of plug-in solar is that it is designed for DIY installation. You mount the panels, plug the inverter into a standard 13A socket, and notify your DNO within 28 days. You do not need anMCS-certified installer. However, you are responsible for obtaining any necessary permissions from property owners, landlords, freeholders, or managing agents, and electrical modifications must be done by qualified electricians. You must follow BS 7671 Amendment 4 wiring requirements (labelling, RCD type, cable routing).

Does this apply to Scotland and Northern Ireland?

The SI applies to Great Britain (England, Scotland, Wales). Northern Ireland has its own regulatory regime and may follow separately. Check with your local DNO if in Northern Ireland.

Where can I check if a product is approved?

The official register is the ENA Connect Direct platform. Manufacturers register their IPS-compliant devices there. Only products listed on Connect Direct should be treated as eligible for the route. We also update our approved products list above as soon as registrations appear.


Get started now the route is live

Plug-in solar is legal in Great Britain from 27 August 2026. Here's what to do:

This page was last reviewed on 27 August 2026. It is maintained using an automated regulatory monitoring system that checks for changes every Monday, Wednesday, and Friday. Information is provided for guidance only and is not legal advice.