Plug-In Solar Glossary

Every plug-in solar term in plain English. 36 terms and counting.

Regulation & Legal

BS 7671— BS 7671:2018+A4:2026 — IET Wiring Regulations
The UK national standard for electrical wiring in buildings. Amendment 4 (published 15 April 2026) added wiring rules for plug-in solar installations up to 800 VA — the current edition, published by the IET as BS 7671:2018+A4:2026 (the previous edition was withdrawn on that date). Since 15 October 2026 it is wiring work at the premises that must follow BS 7671 incorporating Amendment 4 — a plug-in kit connects like an appliance, so the device itself is not certified against BS 7671.
ESQCR— Electricity Safety, Quality and Continuity Regulations 2002
UK regulations governing electrical safety on the network. SI 2026/848 amends these regulations to create the legal route for plug-in solar in Great Britain (not Northern Ireland).
G98— Engineering Recommendation G98
The process for notifying your DNO when you connect a small generator to the grid. For the plug-in solar route, check the 800 VA apparent-power limit and 16A per phase threshold. It is a notification, not an application.
G99— Engineering Recommendation G99
The process for connecting larger generators (over 16A per phase) to the grid. Requires DNO approval before connection, unlike G98 which is just a notification.
IPS— Interim Product Specification
The technical specification that plug-in solar devices must meet to be legally sold and used in Great Britain from 27 August 2026. Covers power limits, plug standards, safety, and labelling.
PSSR— Plugs and Sockets etc. (Safety) Regulations 1994
UK regulations governing the safety of plugs and sockets. SI 2026/848 amends these to create a route for approving plug-in solar devices that meet the IPS.
SI— Statutory Instrument
A form of secondary legislation made under authority of an Act of Parliament. SI 2026/848 is the statutory instrument that legalises plug-in solar in Great Britain.
Type Tested— ENA Type Test Registration
A process where inverters are tested against G98/G99 technical standards and registered on the ENA Connect Direct platform. Only type-tested devices are legal for plug-in solar.

Technical

13A— 13 amp plug or socket rating
The standard current rating for normal UK household plugs and sockets. Plug-in solar and battery products should only use a suitable 13A socket exactly as the manufacturer instructs.
800 VA— 800 volt-amperes apparent power
The maximum apparent-power limit used in the official plug-in solar interim product specification. Consumer kit listings often say 800W, but 800 VA is the precise term to check for legal compliance.
AC— Alternating Current
The type of electricity in your home wiring. Solar panels produce DC (direct current) which a microinverter converts to AC so it can feed into your household sockets.
Anti-islanding— Anti-islanding protection
A safety feature that automatically disconnects the solar inverter from the grid if the grid loses power. Required by the IPS to protect engineers working on the network.
BS 1363— BS 1363 — British Standard for 13A plugs and sockets
The British standard for the familiar 3-pin plug used in UK homes. Plug-in solar devices must use an approved BS 1363 plug to be legal.
DC— Direct Current
The type of electricity produced by solar panels. Must be converted to AC by a microinverter before it can be used in your home or fed to the grid.
IP65— Ingress Protection rating IP65
A dust and water resistance rating. IP65 usually means dust-tight and protected against water jets in test conditions, but the product manual still decides where it can safely be used.
Isolation switch— Electrical isolation switch
A switch used to disconnect equipment from the electrical supply for safety, maintenance, or emergency work. Some solar and battery installations need clearly labelled isolation points.
kW— Kilowatt
A unit of power equal to 1,000 watts. Used to describe the capacity of solar panels. An 800W system is 0.8kW.
kWh— Kilowatt-hour
A unit of energy. One kWh means using 1,000 watts for one hour. Your electricity bill is measured in kWh. A typical 800W plug-in solar system generates 600-900 kWh per year.
LFP— Lithium iron phosphate
A lithium battery chemistry commonly used in home storage. It is generally chosen for thermal stability and long cycle life, but it still needs correct charging, placement, and ventilation.
Microinverter— Microinverter
A small device that converts the DC electricity from a solar panel into AC electricity for your home. Plugs into a standard 13A socket. Must be type-tested and IPS-compliant.
MPAN— Meter Point Administration Number
The electricity supply identifier for your address. Bills may show a 21-digit "Supply Number" or "S Number"; the 13-digit MPAN core is the part usually needed on forms.
MPPT— Maximum Power Point Tracking
Electronics that help a solar panel operate at its most useful voltage and current as sunlight changes. More MPPT inputs can make mixed panel orientations easier to manage.
PVGIS— Photovoltaic Geographical Information System
A free tool from the European Commission that estimates solar energy generation for any location in Europe based on panel angle, orientation, and local weather data.
RCBO— Residual Current Circuit Breaker with Overload protection
A combined RCD and circuit breaker in one unit. Provides both earth fault protection and overload protection. May be specified for plug-in solar installations per the IPS.
RCD— Residual Current Device
A safety device that disconnects the electrical supply if it detects current leaking to earth, protecting against electric shock. The IPS specifies RCD/RCBO requirements for plug-in solar.
VA— Volt-Ampere
A unit of apparent power. The IPS limits plug-in solar to 800 VA maximum (approximately 800W). VA and watts are similar for solar inverters but VA is the technically correct unit.

Financial

Load shifting— Load shifting
Moving electricity use from expensive periods to cheaper periods. A home battery can charge overnight on a cheaper tariff and discharge later when grid electricity costs more.
SEG— Smart Export Guarantee
A government scheme that pays you for electricity you export back to the grid from your solar panels. SEG suppliers offer different rates (1p to 12p/kWh). You register after installing.
Self-consumption— Self-consumption
The proportion of solar electricity you use directly in your home rather than exporting to the grid. Higher self-consumption means more savings. A battery increases self-consumption from ~30% to ~60%+.
Time-of-use tariff— Time-of-use electricity tariff
An electricity tariff where the unit price changes by time of day. Batteries can use these tariffs by charging when electricity is cheap and discharging during expensive periods.

Organisations

Connect Direct— ENA Connect Direct platform
The online platform (connect-direct.energynetworks.org) where manufacturers register IPS-compliant plug-in solar devices. Replaced the old ENA Type Test Register in April 2024. Only registered devices are legal.
DESNZ— Department for Energy Security and Net Zero
The UK government department responsible for energy policy, including the legalisation of plug-in solar. Formerly known as BEIS.
DNO— Distribution Network Operator
The company that maintains the electricity cables to your home. Not your electricity supplier — they are different organisations. You notify your DNO after installing plug-in solar.
ENA— Energy Networks Association
The trade body representing UK electricity and gas network operators. Maintains the Connect Direct platform where manufacturers register compliant plug-in solar devices.
MCS— Microgeneration Certification Scheme
A certification scheme for renewable energy products and installers. Not required for plug-in solar DIY installations, but required for full rooftop solar systems to qualify for SEG.
Ofgem— Office of Gas and Electricity Markets
The UK energy regulator. Oversees the Smart Export Guarantee (SEG) scheme and energy supplier licensing.

Missing a term? Let us know. Put the terms in context: